Investment Casting Foundry | Sand Casting Foundry from China

Stainless Steel Castings, Grey Iron Castings, Ductile Iron Castings

Short Lead Time for Zinc Alloy Gravity Casting - Brass CNC Machining Parts – RMC Foundry

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

It is a good way to enhance our products and solutions and repair. Our mission will be to build creative solutions to consumers with a great experience for Stainless Steel Lost Foam Casting , Steel Full Mold Castinig , Lost Foam Casting Foundry , We have been pretty proud of your superior standing from our shoppers for our products' trustworthy quality.
Short Lead Time for Zinc Alloy Gravity Casting - Brass CNC Machining Parts – RMC Foundry Detail:

Brass CNC machining parts produced by CNC machining centers from China casting company.

▶ Equipment for Precision Brass Machining Components:
• Convertional Machining Machines: 20 sets.
• CNC Machines: 60 sets.
• 3-Axis Machining Center: 10 sets.
• 4-Axis Machining Center: 5 sets.
• 5-Axis Machining Center: 2 sets

Precision Machining Capabilities
• Max Size: 1,500 mm × 800 mm × 500 mm
• Weight Range: 0.1 kg – 500 kg
• Annual Capacity: 10,000 tons
• Accuracy: As per standards: …. or on request. Minimum ±0.003 mm
• Holes to ±0.002 mm dia.
• Flatness, Roundness and Straightness: As per standards or on request.

▶ Our In-house Machining Workshop Give Our Customers the Following Advantages:
• Short lead time for machined castings and forgings.
• Only one contact for castings, forgings and machining.
• Fast transmission between foundry and machining workshop.
• Well communication inside our systems and with our customers.

▶ General Commerial Terms
• Main workflow: Inquiry & Quotation → Confirming Details / Cost Reduction Proposals → Tooling Development → Trial Casting → Samples Approval → Trial Order → Mass Production → Continuous Order Proceeding
• Leadtime: Estimatedly 15-25 days for tooling development and estimatedly 20 days for mass production.
• Payment Terms: To be negotiated.
• Payment methods: T/T, L/C, West Union, Paypal.

 

CNC Precision Machining Capabilities

 

Facilities Quantity Size Range Annual Capacity Accuracy
Vertical Machining Center (VMC) 48 sets 1500mm × 1000mm × 800mm 6000 tonn or 300000 pieces ±0.005
Horizontal Machining Center (VMC) 12 sets 1200mm × 800mm × 600mm 2000 tons or 100000 pieces ±0.005
CNC Machine 60 sets Max turning dia. φ600mm 5000 tons or 600000 pieces   

CNC Machining company
machining factory


Product detail pictures:

Short Lead Time for Zinc Alloy Gravity Casting -
 Brass CNC Machining Parts – RMC Foundry detail pictures

Short Lead Time for Zinc Alloy Gravity Casting -
 Brass CNC Machining Parts – RMC Foundry detail pictures


Related Product Guide:

"Control the standard by the details, show the power by quality". Our firm has strived to establish a extremely efficient and stable employees crew and explored an effective excellent command method for Short Lead Time for Zinc Alloy Gravity Casting - Brass CNC Machining Parts – RMC Foundry, The product will supply to all over the world, such as: Guatemala , New Zealand , Eindhoven , Our company now has many department, and there have more than 20 employees in our company. We set up sales shop, show room, and product warehouse. In the meantime, we registered our own brand. We have tightened inspection for quality of product.
  • Wide range, good quality, reasonable prices and good service, advanced equipment, excellent talents and continuously strengthened technology forces,a nice business partner.
    5 Stars By Darlene from Bolivia - 2018.10.31 10:02
    The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By Janet from Frankfurt - 2017.07.07 13:00